DrySnap Home Page
DrySnap Product Information
DrySnap Installation Instructions
DrySnap Warranty Registration
DrySnap Calculator
DrySnap Photo Gallery
FAQs
Related Products
Contact Us
nav footer




 

Page 4 of 4 / Steps 19-20
Detailed Installation Instructions

Installing Trim Cap

19 If deck frame is even with joist and exposing joist brackets, close in system with treated 1” x 4” boards (FIG.15).

click on image
to enlarge
fig 15  

 

Installing gutter         
20 Refer to gutter installation guidelines for hanging gutter with DrySnap system. Note— Gutter hangers must be hot dipped or stainless steel fasteners must be used if gutter is attached to ACQ treated lumber. If installing aluminum gutter to treated lumber, use a vinyl flashing barrier between the gutter and the ACQ treated lumber.

         
  gutter installation
        guidelines

Return to the Previous Steps


How much do I need to buy? Click here for the DrySnap Materials Calculator.

Return to Home Page

Download PDF of These Instructions.

 

 
 ©2006-2011 DrySnap and Amerimax Industries · US Patent 7,434,358